Skip to content

Mistakes in the model. Not in the factory.

We simulate your production completely digitally, before the first screw is ordered. Investment security through precise planning.

Digital factory simulation by vion solutions

Simulate before hardware

Errors in the model, not in the factory

Why simulate?

Automation projects rarely fail because of the technology.

Almost always it is poor planning: wrong layout decisions, underestimated material flows, unvalidated ROI assumptions. The result: multi-million projects that do not deliver what they promise.

vion solutions simulates your entire production digitally before hardware is procured. Errors stay in the model, not in your factory.

  • Investment decisions based on validated data
  • Risks identified before hardware is ordered
  • Projects that deliver what they promise
  • One point of contact from concept through to handover

Service portfolio

What we do for you

Digital factory simulation

We validate automation concepts fully digitally before hardware is procured. Material flow analysis, bottleneck detection and capacity planning: all in the model.

Layout design & intralogistics

Optimal use of space, material flow and hall layout for brownfield and greenfield. We deliver the floor plan that actually works.

Business case & ROI modelling

No decision without numbers. We build precise investment models and validate return on investment before every project.

Lean audit & process analysis

An external industrial engineering view of your production. We identify waste, bottlenecks and optimisation potential, without internal blind spots.

Digital Twin (pre-implementation)

A complete virtual replica of your planned factory: simulated, tested and optimised before the first machine is purchased.

Project management

From concept through to handover: vion takes responsibility for schedule, budget and results. One point of contact, not ten.

How we work

From analysis to a working factory

01

Analysis & discovery

We analyse your existing production, material flows and requirements. Outcome: a clear picture of the as-is state.

1–2 weeks

02

Simulation & modelling

Your digital twin takes shape. We simulate scenarios, stress-test bottlenecks and iteratively optimise the layout.

2–4 weeks

03

Business case & decision

Validated ROI, risk assessment and a clear investment recommendation, so you can decide with confidence.

1–2 weeks

04

Delivery & support

We support realisation, coordinate suppliers and ensure the outcome matches the model.

Project-dependent

Ready to make mistakes in the model instead of the factory?

Talk to our experts about your automation project. Free initial consultation, no obligation.

Production does not have to be perfect. But it has to be controllable.

Enquire now